From approved sample to bulk production

Keep the approved garment connected to the order.

Explore the journal
Finished garments & packing preparation

Quick answer

Before releasing bulk production, identify the approved sample and specification, confirm quantities by style, color and size, and resolve material, artwork, packaging and delivery details. A sample approval should point to a complete order record, not replace it.

Assemble the release record

Create one current order record linking the style code, approved sample, specification revision and artwork files. Add the agreed material and trim references, color identifiers, labels and packing instructions. A reference garment is valuable, but the team also needs to know which written version belongs to it.

Check the order breakdown by style, color and size. For sets, make clear whether tops and bottoms are paired in fixed combinations or ordered separately. Ask SALATI to confirm the order scope, the applicable quantities and any open sourcing decision before work is scheduled.

Attach the accepted quotation and the terms agreed for the project. These may cover sample development, production, packing and shipment in different ways. Identify any item that remains outside the quotation. A proposed quantity, requested date or earlier discussion should not silently become an approved order instruction.

a navy hoodie sample with front and back technical drawings and fabric swatches
From the brief to the sample
nickel zipper, graphite buttons, navy rib and cotton fabric swatches
Closures, rib & garment trims

Understand the manufacturing handoff

SALATI’s manufacturing process begins with product and process review, fabric and trim sourcing, pattern development, sampling and client revisions. Pre-production sample approval is followed by scheduling, cutting, sewing, decoration or finishing, pressing, inspection, packing and shipment. Use those stages as a conversation framework, then ask which sequence applies to your design.

At each handoff, identify the reference being used and the decision required to move forward. For materials, that may mean a confirmed fabric and trim combination. For sewing and finishing, it means the current construction and decoration requirements. Avoid assuming that every style follows exactly the same operation order.

Ask which activities SALATI coordinates for the specific garment and where the relevant work will take place if that matters to your project. SALATI offers several technique directions, but it does not establish that every operation is performed in-house. Record the answer alongside the agreed production plan.

Inside SALATI

A closer look at the factory floor

A short, silent film from the SALATI archive. Use it to start a conversation about the production steps for your garment.

Request updates that support a decision

Agree an update rhythm and a single contact for collecting questions. Useful updates identify the style, stage, current issue and next action. A photograph without a style code or explanation may show activity without clarifying what you need to approve. Ask that any item requiring a buyer decision is separated from general progress information.

When a proposed change appears, record the original requirement, the suggested alternative and the reason. Ask which part of the garment, order scope or schedule would be affected. Confirm the decision in writing and update the approved files before treating the alternative as the new reference.

Keep commercial and production dates precise. Distinguish a target completion date, planned dispatch and requested arrival. Material availability, order quantity and process complexity can affect the project, so ask for the applicable schedule after the scope is reviewed. A general fastest-case statement is not the schedule for your particular order.

Agree the inspection and packing information

Ask how the finished order will be checked against the approved sample and specification. Define which measurements, construction details, decoration, labels and quantities need to be reviewed, together with the evidence you expect to receive. Inspection is included in SALATI’s manufacturing process, but a specific inspection method or acceptance standard should be agreed for your order.

If you require particular testing or records, raise the requirement while the brief is being reviewed. Identify the product, material and purpose clearly. Ask for the relevant documentation rather than treating a general capability statement as evidence that a particular test has been completed.

Prepare the packing instructions before the final stage. SALATI lists individual packs, hang tags, carton marks and export packing. Specify the arrangement you need: identification on each packed garment, size and color information, set pairing, carton contents and any buyer reference required on the cartons. Confirm who supplies each final artwork file.

overlocked interior seams, rib cuff attachment and zipper tape beside an inspection loupe
A closer look at garment quality

Prepare for dispatch and the next order

Confirm the consignee, destination and contact details before shipment is arranged. SALATI’s shipping options include sea freight, air freight and international express. Ask which option is proposed for your order, what the quotation includes and how the expected dispatch and arrival information will be communicated.

Review the shipment records and packing information against the order breakdown. Keep an accessible copy of the approved specification, production correspondence and the documents supplied with the shipment. At receipt, use the carton identification and your order record to organize the check, and record any issue with photographs and the affected style, size or carton reference.

For a reorder, begin with the previous order code and its approved reference. State whether you want an exact repeat or a revision, and list the changes separately. Ask for current confirmation of the material, quantities and schedule; the previous order is a useful reference, not an automatic commitment to unchanged commercial terms.

Production handoff checklist

Keep this checklist with the final order record and use it to identify the remaining decisions before release.

  • Approved sample, specification and artwork revisions match.
  • Style, color, size and set quantities are reconciled.
  • Materials, trims, labels and packaging references are connected.
  • The quotation scope and remaining open items are recorded.
  • Updates, change approvals and contact responsibilities are agreed.
  • Inspection information and packing instructions are defined.
  • Destination, dispatch expectations and shipment arrangements are confirmed.

Example: control a change after sample approval

When a change is proposed after approval, give it a separate change reference. Link it to the affected style, order and original specification. Ask what work has already been completed and what the proposal would affect before responding. A short message approving a substitute should not leave its effect on appearance, price or timing undefined.

The example below concerns a proposed trim replacement. It is a planning template, not a real SALATI production event. Do not fill its impact fields with assumptions. Request the relevant information from the team and identify whether you need a photograph, revised document or physical sample to make the decision.

Once a decision is reached, name the approved replacement or record that the proposal was rejected. Update every affected reference and tell the people using those documents which version is current. Keep the change log with the final order record, including any agreed commercial or schedule adjustment. This makes later inspection and a possible reorder easier to discuss against the garment actually approved.

Change-record fieldInformation required
Original requirementApproved trim reference and specification version
Proposed replacementIdentifiable reference and reason for the change
Effect to reviewAppearance, construction, care, cost and schedule
Decision evidenceRequired sample or document, decision owner and written outcome

Common questions

Is approving a sample enough to place a production order?

The approval should identify the sample and specifications, but quantities, pricing, materials, packaging and shipment arrangements must also be agreed. Keep one complete release record.

What if the artwork changes after sample approval?

Identify the new artwork version and ask the team to review its effect on materials, decoration, price and timing. Reconfirm the relevant reference before production proceeds.

Bring the details to SALATI.

Share your reference, planned quantity and the decisions you would like help with.

Discuss your project
Preview & download the working checklist

Keep these points with your project notes. The PDF includes the complete guide and checklist.

  • Approved sample, specification and artwork revisions match.
  • Style, color, size and set quantities are reconciled.
  • Materials, trims, labels and packaging references are connected.
  • The quotation scope and remaining open items are recorded.
  • Updates, change approvals and contact responsibilities are agreed.
  • Inspection information and packing instructions are defined.
  • Destination, dispatch expectations and shipment arrangements are confirmed.

This guide explains development decisions. Confirm fabric availability, specifications, minimum quantities, fees and delivery terms for your individual project with SALATI.